We preserve the environment through several types of undertakings :

  • prevention of natural risks
  • rehabilitation of tunnels in urban areas
  • shutting down difficult-to-access tunnels
  • rehabilitation of industrial and mining sites
  • securing former mines
  • installation of water quality control facilities and gauging stations
  • development of devices for fauna and flora protection
  • site decontamination
  • terrain containment
  • wastewater treatment
Building of torrential lava guards – Pyrénées

Techniques used :

  • selective excavations
  • realization of sealed concrete stoppers
  • site decontamination
  • pipe fitting
  • building work and civil engineering
  • specialized works
  • terrain containment
  • reconnaissance drilling
  • drainage and passive treatment
Shutting down of a gallery using a chiropteran slot pannelx

Treatment of industrial and mining sites

2 Ha-secondary mining patch, 4 condemned shafts and 5 wells, 180 to 483 ml, filled in again. Rubble used as backfill, protected with a watertight layer of materials and topsoil and sowed with local grass. Elimination of an ovoid under the backfill and construction of an aerial crosswalk with plunge pool and cascades

Before treatment
After treatment

Treament of a tailing pond of roughly 3,5 million m3. Slight terrain remodeling to shape the slopes, applying a watertight layer of clay, a layer of topsoil and sowing with local grass.

Before treatment
After treatment (about10 Ha)
Here, sealing of 2 mine wells 370 ml and 280 ml deep, backfill with excavation materials, self-locking concrete stopper and reinforced concrete slab.
2 tunnels, entirely shut down except for the crawling fauna.
High-mountain gallery equipped with nesting boxes for crows.

Shuting down of a mountain gallery equipped with a chiropteran slot pannel (of the Negrel type)

Prevention of natural risks, rockfalls, floods, preservation of water quality, fauna and flora

Clearing of debris after flood
Gauging station (Diren)
Clearing of debris after flood
Gauging station (Diren)

Prevention of natural risks, preservation of water quality, fauna and flora

Comprehensive station for quality and flow control, technical room.
River station and access stairway
Construction of a fish factory upriver from a dam before the drain
Construction of a small bridge and a wooden flow meter
Construction of a downstream waterway for the fish (here, trout from the Vis river)

Our commitment to transparency

« Our own future is also our children’s,
let us teach them about sharing it,
and above all preserving it. »

Transparency is paramount when it comes to water, and also when it comes to our actions and intention
Discretion is every bit as important as a quality approach
Personal freedom matters